Virginia Solar Farm

Virginia Solar Farm Market Construction Application Stabilization Dose Rate 3% Solar farm construction is on the rise, and requires stabilized soils for substations and access roads. This solar farm project needed to offset low cement availability by supplementing...

ISTHA I-294 Project

ISTHA I-294 Project Market Construction Application Modification & Stabilization Dose Rate 2.5% - 3% ISTHA was tasked with a roadway widening and bridge reconstruction job on I-294 in Northern Illinois. The contractor, Bedrock Stabilization, used pulverized quicklime...

ODOT US Route 24 in Cecil, OH

ODOT US Route 24 in Cecil, OH Market Construction Application Drying & Stabilization Dose Rate 7% An embankment in northwestern Ohio started to slip due to extensive rainfall, requiring ODOT to quickly find a solution. Based on test results, ODOT decided the best...

Miami Valley CTC

Miami Valley CTC Market Construction Application FDR Dose Rate 5% Balsbaugh Excavating was tasked with a 115,000 SQ FT building pad. The project was to be done in a three month time span, during the rainy spring season. On top of that, the soil was a fat clay soil....

VDOT I-81 Highway

VDOT I-81 Highway Market Construction Application FDR Dose Rate 5% I-81 was the first U.S. Federal Highway FDR project. VDOT needed a long-term fix for a 3.7-mile stretch of road that was severely damaged due to heavy truck loads and high traffic. Calciment® was...