Salt Creek Substation

Projects Salt Creek Substation Market Construction Application Drying & Stabilization Dose Rate 3% Project Overview Building pad for a substation on a solar farm in IL A blend of quicklime and cement was utilized on the jobsite to achieve the required strength The...

Virginia Solar Farm

Projects Virginia Solar Farm Market Construction Application Stabilization Dose Rate 3% Solar farm construction is on the rise, and requires stabilized soils for substations and access roads. This solar farm project needed to offset low cement availability by...

ISTHA I-294 Project

Projects ISTHA I-294 Project Market Construction Application Modification & Stabilization Dose Rate 2.5% - 3% ISTHA was tasked with a roadway widening and bridge reconstruction job on I-294 in Northern Illinois. The contractor, Bedrock Stabilization, used pulverized...

ODOT US Route 24 in Cecil, OH

Projects ODOT US Route 24 in Cecil, OH Market Construction Application Drying & Stabilization Dose Rate 7% An embankment in northwestern Ohio started to slip due to extensive rainfall, requiring ODOT to quickly find a solution. Based on test results, ODOT decided the...

Miami Valley CTC

Projects Miami Valley CTC Market Construction Application FDR Dose Rate 5% Balsbaugh Excavating was tasked with a 115,000 SQ FT building pad. The project was to be done in a three month time span, during the rainy spring season. On top of that, the soil was a fat clay...